Chicago Executive Airport, hereinafter referred to as “Airport”, is seeking proposals from qualified Consultants, contractors, or consultants, hereinafter referred to interchangeably, to provide professional services in updating the Airport’s Master Drainage Study and Supplemental Storm Drain Reports. This Request for Qualifications (RFQ) describes the Project, the required scope of services, the selection process, and the minimum information that must be included in the proposal. Failure to submit information in accordance with the RFQ requirements and procedures may be cause for disqualification. Necessary services required to complete the new update include drainage analyses, storm drain design, calculations and results, financial analyses, GIS data collection and presentation. Interested parties shall submit a proposal with capabilities to provide these services per the specifications outlined in this Request for Qualifications. Submittal deadline is 4:30 p.m. Monday, November 21, 2022.
Exhibits
- 1 Request for Qualifications (Includes Request for Information by Potential Bidders)
- 2 Equal Opportunity Program Requirements
- 3 Hydrologic and Hydraulic Analysis for the Relocation of the Wheeling Drainage Ditch Final Report (1995) aka “Master Airport Drainage Study”
- 4 Master Drainage Study Update for a Letter of Map Revision (May 2003)
- 5 Grading Plan for Master Drainage Study 9/23/03
- 6 Remaining Detention Summary – August 2022
- 7 Master Drainage Site Plan
- 8 Master Drainage Site Plan Contour Map (.pdf)
- 9 Master Drainage Site Plan Inventory of Known Stormwater Drainage Fixtures
- 10 FAA Advisory 150/5100-14E Architectural, Engineering, and Planning Consultant Services for Airport Grant Projects
- 11 MWRD Watershed Management Ordinance (current)
- 12 Wheeling Village Stormwater Master Plan 2016
- 13 PWK Airport Layout Plan
- 14 PWK Master Plan Final Full Report- Final
- 15 Master Plan Contours in AutoCAD Format
- 16 Publication Updates and Notes (Published October 28, 2022)